Project Implementation Progress of 2008

September 10, 2008Panorama-Osia-10-Sept-2008-Kitchen&W-shop-VLQ.jpg

 Today, we are finishing the kitchen wall as the roof is now on. Afterthis we will continue with the plastering of the kitchen and placing the furnace.


April 18, 2008

 panorama-Osia-18-April-2008-Dorm1.jpg


progress-08-04-06-roofwork-IMG_4107.JPG

April 6, 2008

Today, we have laid the top ridges on the roof of our first dormitory block.

And what a beautiful sight it is, right from the road you can now see that something serious is happening here in Osia.

Thank you our donors who make us able to continue doing this work.

 

Thank you Lord for motivating people to be involved in this "joint-effort"


progress-1200mtr-pipe-IMG_4067.JPG

March 8, 2008

1200 Meter of pipe

And not to forget the 100 cubic meter of rock that has been chissled out of the rock to make place for the ceptic tanks and the soak-pits.

All this amounts to the complete sewage system that we burried in the ground in Osia. You won't see it tomorrow, but you surely will use it after you use the bathroom.

The distance from the top of the land to the bottom of it is 300 Meters. We have had to burry one sewage pipe, one waste water pipe, one fresh water pipe and one pipe for cables.

It is an investment that is a bit hard in the beginning but it will make it easy to add another building lateron.

We have burried these pipes with a layer of cement to protect them.


progress-ceilling-sheets-IMG_4063.JPG

March 5, 2008

Ceilling sheets

After a long wait, due to material availability, we have managed to make our start on the ceilling sheets. They are needed because the roof will be covered by rooftiles and rooftiles are not 100% waterproof. They allow a spray of water to blow through when rain is accompanied with wind (as it usually does here)

When the boys are finished with this, we will be able to hurry on with the roof-tiles which we have already bought.

 

 

 


progress-2008-02-20-koelewijns-plan-a-tree-IMG_4055.JPG

Feb 20, 2008

Tree Planting Exercise

As our 25 acre land in Osia is a very empty and totally void of trees we decided it was time to do something about this. The problem on our land is that it only has 30cm of soil, underneath that we have solid volcanic rock! And so trees can not really get started untill you give them some help.

So we started digging holes in this rock of ne cubic meter. We filled it with good top-soil and planted trees right in the middle of it.

We dug 100 holes like that and have now plated all the trees.

As we, Cor & Grace had not yet plated "our" tree, we thought it was a nice idea to plant the one right in the center of our first dormitory. This was a 'ficus' tree and I was told it becomes very big with lots of shade. (but they can tell me anything because me and trees dont really speak the same language ;-) )


Jan, 2008

 

Due to the political gaos in Kenya, Uganda faced an acute fuel shortage. This completely cripled our activities during the month of January.

When our neigbours Kenya sneeze, we catch a knumonia! It's THAT bad!